Changzhou Terrace
After cleaning the substrate, a non-curing adhesive was applied before laying the stainless steel waterproofing roll.
Changzhou · 28 m²
View project →Selected applications of SRS stainless steel waterproofing materials.

After cleaning the substrate, a non-curing adhesive was applied before laying the stainless steel waterproofing roll.
Changzhou · 28 m²
View project →
The substrate was cleaned before the self-adhesive stainless steel waterproofing roll was laid directly.
Changzhou · 12 m²
View project →
The substrate was cleaned, a non-curing adhesive was applied, and the insulated stainless steel waterproofing roll was installed.
Wuxi
View project →
After substrate cleaning, the stainless steel waterproofing roll was laid over a non-curing adhesive.
Nanjing · Over 1,000 m²
View project →
After substrate cleaning, the stainless steel waterproofing roll was laid over a non-curing adhesive.
Shanghai · 120 m²
View project →
After cleaning, the insulated self-adhesive stainless steel roll was installed directly over the existing bituminous membrane.
Wuxi · 150 m²
View project →
After cleaning, the stainless steel waterproofing roll was installed with a non-curing adhesive.
Taizhou · 40 m²
View project →
The gutter substrate was cleaned before applying a non-curing adhesive and laying the stainless steel waterproofing roll.
Nanjing
View project →
Previous repair layers were removed and a new cement layer was formed. A substrate consolidant was applied before installation, with stainless steel waterproofing tape used around the details.
View project →
A non-curing adhesive was applied over the existing SBS bituminous membrane before the stainless steel waterproofing roll was laid.
View project →
The existing cement substrate was cleaned and treated with a primer before laying the stainless steel waterproofing roll.
View project →
After cleaning, the stainless steel waterproofing roll was installed directly over the tiled surface.
View project →
After cleaning, a non-curing adhesive was applied to the existing bituminous layer before installation.
View project →
After cleaning, the stainless steel waterproofing roll was installed over a non-curing adhesive.
View project →
The metal roof sheets were removed. The existing cement substrate was cleaned and primed before installation. The completed roof can be accessed on foot.
View project →
The surface was cleaned before the stainless steel roll was bonded with cement mortar.
View project →
After cleaning, the stainless steel waterproofing roll was laid over a non-curing adhesive.
View project →
Rust was removed from the existing profiled metal roof before the material was applied directly.
View project →
After cleaning, the stainless steel waterproofing roll was applied directly.
View project →